In 2021, the NIMAC worked with Evergreen Evaluation & Consulting (EEC) to conduct a “gap analysis” relating to state and district TA needs surrounding NIMAS and AEM. This report is now available and can be downloaded here.
In 2021, the NIMAC worked with Evergreen Evaluation & Consulting (EEC) to conduct a “gap analysis” relating to state and district TA needs surrounding NIMAS and AEM. This report is now available and can be downloaded here.